Brand: Eelhoe
Model Number:
Availability:
In stock
Minimum order quantity: 1
Maximum order quantity: 5
Listed date: 22nd Feb, 2025
Precautions for use:
1. Clean the tile floor before use to keep the floor free of dirty water stains. If the gap between the tiles is too deep, use a sealant to fill the gap first. The product does not need to be mixed and can be brushed immediately after opening the lid. Before construction, block the floor drain to prevent glue leakage.
2. For large-area construction, it is recommended to first wall and then the floor, first inside and then outside, to facilitate the exit of the construction workers. During construction, the colloid should be brushed as thinly as possible (the film will dry faster), and key locations (edge of toilet/floor drain/wall corner gap) and other parts It is recommended to apply it twice (for better effect). During construction, the application should be completed in one go to form a continuous and smooth waterproof membrane on the base surface.
3. It is recommended that the place be ventilated after construction. The colloid should not be exposed to water or stepped on before it is dry and solidified. When the colloid is at room temperature above 20°C, it will dry in 2 hours and can form a film in 5 hours. The lower the temperature, the slower the curing (lower temperatures in winter will cure Time may affect).